LOX Foamglas Tank Insulation
Location
Oxnard, CA
Oxnard, CA
Timeline
November 2021
November 2021
Service
Insulation
Insulation
Owner/General Contractor
Stainless Process Systems
Stainless Process Systems
Project Description
- Apply RG-2400 LT over the entire stainless steel tank before installing Foamglas insulation.
- A 72″ diameter x 12′ long tangent to tangent tank with two elliptical heads.
- Applied two layers of 3″ thick Foamglas and banded with 3/4″ stainless steel bands. on 12″ centers.
- The jacketing was .20″ thick stucco embossed aluminum secured with 3/4″ stainless steel banding on 11″ centers.